ASFINAG - Documentation General Renewal A 23
Long time lapse system
3D Construction Site Camera System
Period: 36 months
Mobile time lapse unit
Full service drone flying
Real film + sound recording
Advertising photography / photo documentary
Postproduction
- Stabilize, correct, and deflicker 6K footage
- various 4K final videos for TV/cinema and social media
- Express post production for footage provision for current reporting (ORF/ServusTV, etc)
ASFINAG - General Renewal A 23
The main works of the general renewal of the nearly three kilometer long section of Hochstraße St. Marx took about 3 years and were completed in November 2022 and February 2023.
The centerpiece of this never-opened interchange was a 550-ton bridge over the tangent. For this, ASFINAG used one of the largest crawler cranes in Europe and simply excavated the bridge in one piece, which we were able to capture with our cameras and drones. For these measures, the A 23 between the Gürtel and the Verteilerkreis was also completely closed to traffic for several hours for the first time.
Read more: https://blog.asfinag.at/hinter-den-kulissen/tangente-neu/
Full Service
Technical and visual advice on installation locations, assembly and disassembly of cameras, planning of drone flights incl. permit applications, creation of photo and film material with original sound recordings
Construction site time lapse
8 pcs 6K Helios time-lapse cameras for outdoor shooting, 2 pcs motion time-lapse camera units, commercial photography, film and sound recording, drone flying in 6K.
24/7 support and data provision
24/7 monitoring of the cameras by our staff, interface with availability of all data in full resolution
Time-lapse video creation
4K video from all angles, drone flying etc. suitable for internet, social media, cinema, TV